Data sourced from public government portals under NDSAP (National Data Sharing & Accessibility Policy).·This is NOT an official government website.·Powered by Article 19(1)(a) — Right to Information.
Data Transparency Notice:Infrastructure project data on this page is aggregated from NHIDCL (Ministry of Road Transport & Highways), AIIB project monitoring reports, CCML, Government of Manipur budget documents, Lok Sabha parliamentary records, and the Manipur project monitoring portal (darpanmanipur.in). Your Manipur does not independently verify construction progress or budget figures. Each data point is linked to its source. For official project status, contact the executing agency directly. This is not an official government tracker.
🛣️ National Highway Projects (NHIDCL)
Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokpi to Sekmai section of Imphal-Kohima Road (Design Ch.: km 287.00 to 297.700) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-5A)
Improvement/Up-gradation of existing 2-lane to 4-Lane Divided Highway from Taphou Kuki to Daili section of Imphal-Kohima Road (Design Ch.: km 262.175 to 274.610) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-4A)
Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road (Design Chainage from Km 297+700 to Km 308+729) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-5B)
Improvement/Up-gradation of existing 2-lane to 4-Lane Divided Highway from Daili to Kuraopokpi section of Imphal-Kohima Road (Design Ch.: km 274.610 to 287.00 ) of NH-39 (New NH-02) in state of Manipur on EPC mode (Pkg-4B)
NHIDCL · A K Shivhare Infrastructure Pvt. Ltd.nhidcl.com
4 NHIDCL projects in Imphal West: 4 ongoing, 0 completed, 0 upcoming. Total investment: ₹1089 Cr. Average progress: 72%.
📋 Updated: 14 September 2026·
🏙️ Urban Infrastructure & Major Projects
National Highway Development — Manipur (Parliamentary Report)
NHIDCL · MoRTH · PWD ManipurLok Sabha (MoRTH)
📊 754 km completed · 🚧 325 km under execution · 📋 51 NHIDCL packages · 181 km PWD (5-year)Verified source: Lok Sabha Unstarred Q No. 805, answered 4 Dec 2025 by MoRTH. Full PDF with project-wise annexure available.
Manipur has 1,692 km of national highways — 1,399 km under NHIDCL, 293 km under State PWD (routine maintenance only). As of Dec 2025: 51 works covering 1,079 km taken up by NHIDCL; 754 km completed, 325 km remaining under execution. State PWD blacktopped 181 km in the last 5 years. NH-137A strengthening sanctioned 21 Oct 2025 at ₹74.22 Cr. Annexure with project-wise completion dates included in the parliamentary reply.
📋 Updated: 14 September 2026·
MURDAMIP — Active Procurement (July 2026)
PWD Manipur · AIIBaiib.org
📊 2 monitoring reports published · 🏗️ Procurement active · 📋 4,843 HHs in project area🌊 Storm water drains · 🚶 Pedestrian walkways · 💡 Street lighting · 📡 Utility ducts
Multiple contract award notices issued through July 2026. Project Implementation Monitoring Reports published: August 2025 and February 2026. Latest AIIB field visit: February 2026. 4,843 households affected — compensation and resettlement ongoing.
Ring road around Greater Imphal, funded as Externally Aided Project. Included in Manipur Budget 2025-26. Will provide circumferential connectivity to decongest city center.
📋 Updated: 14 September 2026·
Imphal Elevated Corridor
NHIDCL · MoRTHEconomic Times
📍 Imphal · 📋 DPR stage — transferred to NHIDCL · 🗓️ Approval anticipated before 2027 elections💰 ₹3,692 Cr · 🛣️ 25 km elevated · Will redefine Imphal's skyline and ease congestion
25 km, 4-lane elevated corridor: Koirengei Junction → bifurcation near Raj Bhavan → Manipur University (NH-102) and Imphal Airport (NH-02). Plus 2-lane flyover from CM Traffic Rotary to City Convention Centre. Estimated cost: ₹3,692 Cr.
📋 Updated: 14 September 2026·
MURDAMIP — Urban Road & Drainage Improvement
PWD Manipur · AIIBaiib.org
📍 Greater Imphal · 🏗️ ~10% concrete, ~50% bituminous complete (Jan 2026) · ⏱ Active construction💰 ₹3,647 Cr total · 🌊 Includes drainage, walkways, street lighting, utility ducts
547 km of urban and sub-urban roads in Greater Imphal being upgraded to rigid concrete pavement with continuous lined storm water drains. First-ever rigid pavement project in Manipur. Funded: ₹3,647 Cr (₹2,896 Cr AIIB loan).